Plan Database Moves Around Compatibility and Cutover Needs

We assess source and target platforms, data, stored code, and connected applications for the databases in scope. Together with your team, we agree the migration approach, validation checks, cutover plan, and recovery arrangements. Engagements can cover assessment and planning only, or also include conversion, cutover, and a defined post-migration support period.

What We Deliver

Where We Make the Difference

Migrations involve more than copying data. Schema objects, stored code, data types, application queries, drivers, jobs, and integrations can all behave differently on the target. We identify these differences as early as practical, agree how each will be handled, and set validation and acceptance criteria before production cutover.

01

Conversion Between Platforms

We assess and convert schemas, stored procedures, triggers, and data types for the agreed scope, using conversion tools where they help and manual changes where they do not. Features without a direct equivalent may need redesign, application changes, or an accepted limitation, which we record with your team.

02

Data Validation and Reconciliation

We agree validation checks such as row counts, totals, sampled record comparisons, and business-rule queries, then run them at defined points in the migration. Results are reported against the agreed checks, so business owners can see what was compared and what was not.

03

Cutover Planning Around Downtime Limits

Where the platforms and tools support it, change data capture or replication can apply source changes to the migration target before cutover. Feasibility depends on logging, keys, data types, licensing, and change volume. Testing that changes target data needs a separate copy or an agreed isolation and reset approach. The cutover plan includes any required write pause, synchronization checks, and validation.

04

Performance Comparison

We capture available baselines on the source and run representative queries or workloads on the target to compare behavior against agreed criteria. Differences found before go-live are prioritized with your team. Matching source performance is a goal to test, not an assumption.

Our Approach

How We Deliver Complex Database Migrations

  1. Step 1: Assess Source, Target, and Dependencies

    Establish scope and access, inventory objects, stored code, data volumes, and connected applications, and record compatibility gaps, risks, and open questions. Discovery coverage depends on the access and documentation available.

  2. Step 2: Agree the Approach and Criteria

    Select the migration pattern and tools for the platforms involved. Agree downtime limits, validation checks, acceptance criteria, responsibilities, and the point after which returning to the source is no longer planned.

  3. Step 3: Convert, Test, and Rehearse

    Where implementation is included, convert objects in iterations, test with application owners, and rehearse data movement and cutover in a non-production environment that reflects production as closely as practical.

  4. Step 4: Cut Over, Validate, and Hand Over

    Where execution is included, run the agreed cutover, complete validation checks, and confirm acceptance with business and application owners. Post-migration support, where included, has an agreed duration and responsibilities.

FAQ

Common Questions

Something we did not cover? Ask us directly.

How much downtime should we plan for?

It depends on data volume, change rate, the platforms involved, the migration method, and how long validation takes. Replication-based approaches can shorten the final cutover where both platforms support them, but some downtime or read-only time may still be needed. We estimate the required window after assessment and refine it through rehearsal, documenting assumptions and contingency time.

Will our applications need to change?

Often, when the database engine changes. Embedded SQL, drivers, connection settings, and vendor-specific features may need updates, and managed cloud services can restrict features, extensions, or configuration. The assessment identifies known changes, testing with application owners confirms them, and code changes are either included in scope or handled by the owning team.

Can we go back to the old database if the cutover fails?

Returning to the source depends on its availability, application and connection changes, and whether production writes have remained controlled. After the target accepts new transactions, returning may require reconciling or transferring those changes, which may not be supported or practical. We agree recovery options, decision points, and limits before cutover, and test the supported procedures where practical.

How do you confirm the data migrated correctly?

We agree validation checks with your team, such as row counts, totals, sampled record comparisons, and business-rule queries, and run them at defined points. Data type and character encoding differences between platforms are reviewed explicitly. Results show which checks passed and what was not compared, and business owners confirm acceptance before the source is retired.

How is this different from a version upgrade or a cloud migration?

A version upgrade keeps the same database engine and is covered by Database Upgrades. A migration moves data and code to a different engine, platform, or hosting environment. When applications and infrastructure are moving too, our Cloud Migration Services cover the wider workload, and the database work is planned within it.